A City of Ottawa access permit takes six to eight weeks. If you want a new or wider driveway this season, start now.
Osgoode ward Long rural laneways Free written quotes

Driveway paving in Greely, long laneways priced on what they actually cost

Paving a Greely laneway costs $1 to $4 per sq ft in graded gravel, $2 to $5 in tar and chip and $5 to $10 in asphalt, and on a long lane a mix with asphalt near the house often makes sense. Paving Experts Ottawa shows the cost of moving material to site as its own line.

Haul distance shown as its own line rather than hidden in the rate
Gravel and tar and chip quoted as real options, not consolation prizes
Full laneway length measured rather than estimated
Ditch and culvert condition checked at the road edge

Get a Greely laneway quote

Tell us the approximate length and the surface it has now.

What can we help with?

So the right crew reviews your project.

Every quote is measured and priced on site.

What drives the price on a rural laneway

On large Osgoode ward lots the cost structure is different from a suburban double, and pretending otherwise produces bad quotes.

Haul distance

Granular and hot mix are heavy and cheap per tonne, so the cost is largely in moving them. Distance from the aggregate pit is often the single largest cost line on a long laneway, and it is worth seeing it written down.

Gravel is a real surface

At $1 to $4 per square foot, a well built and well drained gravel laneway is a legitimate choice on a long rural approach, not a downgrade. The base work matters more than the surface on a driveway this size.

Tar and chip in between

Tar and chip runs $2 to $5 per square foot and sits between gravel and asphalt. It sheds water, it does not need sealing on an asphalt schedule, and it suits a long approach where full asphalt is hard to justify.

Completed project

Recent Project in Greely

A concrete laneway beside the house, running back to a detached double garage. The run is broken into panels by straight control joints, with a broom finish for traction and a tooled edge along the planting strip. A long side driveway like this follows the grade of the lot from the garage down to the street, so water runs off toward the road instead of pooling at the garage door.

Get a Greely quote

Large lots, wells, septic and open ditches

Greely sits in the Osgoode ward and is rural in character, with large lots, wells and septic systems and ditches rather than curbs. All of that affects driveway work. Laneways run long enough that material volume becomes the dominant cost. Septic beds and well heads are things a machine has to stay off, so the route matters and the access for trucks matters. Frontages have open ditches, so an entrance crossing one needs a culvert built to City standard and the ditch has to keep carrying water afterwards. None of this makes a Greely job harder. It makes it different, and it means a suburban square foot rate applied to a rural laneway will be wrong in one direction or the other.

Three surfaces for a Greely laneway

On a large lot with a long approach, the surface choice is a real financial decision rather than a matter of taste. These are Ottawa ranges and every laneway is measured on site.

Graded gravel

$1 to $4 per sq ft

A legitimate rural surface, not a consolation prize
Frees budget for excavation to competent ground
Granular placed and compacted in lifts
Needs periodic grading and topping up

New asphalt

$5 to $10 per sq ft

Earns its cost at the house and the turning area
A hybrid is often the sensible answer on a long lane
A thin mat on a poor base fails whatever the surface
Remove and repave $8 to $14 where it comes to that

The rural rules that apply on a Greely entrance

Greely sits in the Osgoode ward, and the City rules read differently on a large rural lot than they do on a suburban street. In Zones D to F the maximum driveway width is 50 percent of lot width, which on a large lot is generous. The private approach must still be between 2.4 m and 9.0 m wide and no more than 50 percent of the lot frontage. Where the entrance crosses a ditch, a culvert built to City standard is required, with a $112 inspection alongside the $193 residential access permit and six to eight weeks of processing. Most properties out here are on a well and a private septic system, and both sit somewhere heavy equipment has to cross, so the route in and out is agreed before anything gets dug. Plan the paperwork against the season rather than the other way around: plants reopened in the first week of May in 2026 and the practical season runs early May to mid October.

Our Process

How a Greely job runs

1

Measure the whole laneway

We measure the actual length and width rather than working from an estimate, because on a long approach a 20 percent measurement error is a very large number at the bottom of the page.

2

Map what to avoid

Septic bed, well head, soft ground and tree roots all get located before equipment moves. Rural sites have things under them that a suburban lot does not.

3

Talk surfaces honestly

We price gravel, tar and chip and asphalt side by side where more than one makes sense, so you can see what the extra spend actually buys on a laneway of your length.

4

Build base first

Whatever the surface, the base and the drainage carry the laneway. Granular goes in in compacted lifts and the grade is built to shed water to the ditch line.

Haul from the aggregate pit is the biggest line on a Greely paving quote

A suburban driveway quote can get away with a single square foot rate because the variables are small. A rural laneway cannot, and the reason is the cost structure of the materials.

Granular and hot mix are heavy and inexpensive per tonne. What you actually pay for is moving them. On a long laneway the volume of granular required is several times what a double driveway takes, and every tonne of it arrives on a truck. Distance from the aggregate pit to the site is therefore often the single largest cost line on a Greely job, larger than the asphalt itself on some builds. Most quotes hide that inside the per square foot number. We prefer to show it, because it tells you something useful: spending more on surface quality costs proportionally less on a job where transport is already committed.

Gravel is a legitimate surface for a long Greely laneway

On a suburban street, gravel would be an odd choice. On a large lot with a long approach it is a legitimate one, and treating it as a consolation prize does homeowners a disservice.

The gap between $1 to $4 per square foot and $5 to $10 for new asphalt is substantial over a long lane, and it frees budget for the part of the job that decides whether the laneway works: excavation to competent ground, granular compacted in lifts, and a crown or cross fall that sends water to the ditch instead of holding it in ruts. The honest trade-off is maintenance. A gravel laneway on a good base outperforms a thin asphalt laneway on a bad one, every winter. The base is what survives that, not the surface.

Any workmanship warranty is set out in your written quote, job by job. Call (343) 314-8525.

Greely driveway questions

Why is haul distance the biggest line on a Greely quote?

Because aggregate and hot mix are heavy, low value per tonne materials, so most of what you pay for them is transport rather than the material itself. On a long rural laneway the volumes are large and the distance from the pit is real, which often makes haul the single largest cost line. We would rather show it to you as a line than bury it inside a square foot rate that looks arbitrary.

Is gravel a downgrade for a Greely laneway?

No. On a long rural approach a properly built and properly drained gravel laneway is a sensible surface, and at $1 to $4 per square foot it lets the budget go into base and drainage where it does more good. Gravel needs occasional grading and topping up, which is the trade-off. It is a genuine option here in a way it is not on a suburban double.

Does tar and chip make sense on a Greely property?

Often, yes. Tar and chip runs $2 to $5 per square foot, sits between gravel and asphalt in both cost and behaviour, and gives a bound surface without an asphalt sealing schedule. On a long laneway where full asphalt at $5 to $10 is hard to justify across the whole length, it is worth pricing properly rather than dismissing.

How wide can a Greely rural driveway be?

In the rural zones the limit is 50 percent of lot width rather than the flat 6 m that applies in Zones A to C downtown and in the urban areas. On a large Osgoode ward lot that percentage is rarely the binding constraint. The private approach at the road still has to be 2.4 m to 9.0 m wide and no more than 50 percent of lot frontage, and where it crosses a ditch a culvert built to City standard is required.

Get a Greely laneway measured and costed properly

We measure the full length, show the haul line and price the surfaces that make sense.

Back to top